The errors what I encountered while validating on SQL node 2. 
 
Before I proceed with Node 2 installation, windows 2008 failover cluster   perfectly does the failover transitions. SQL Node 1 installation successfully   installed. 
 
available online resources while proceeding to SQL node 2 (analysis service   graph)
MSDTC path.
Validating cluster resource SQL   Server (GP_PROD).
 
This resource is configured to run   in a separate monitor. By default, resources are configured to run in a shared   monitor. This setting can be changed manually to keep it from affecting or being   affected by other resources. It can also be set automatically by the failover   cluster. If a resource fails it will be restarted in a separate monitor to try   to reduce the impact on other resources if it fails again. This value can be   changed by opening the resource properties and selecting the 'Advanced Policies'   tab. There is a check-box 'run this resource in a separate Resource   Monitor'.
 
However the over all result showed, "Testing   has completed successfully. The configuration appears to be suitable for   clustering. However, you should review the report because it may contain   warnings which you should address to attain the highest   availability".
 
This warning message goes off after installing the SQL 2008 R2 on node   second.