Pages

Wednesday, 8 August 2012

Validation errors while installing SQL 2008 R2 on Node 2 Cluster

The errors what I encountered while validating on SQL node 2.
Before I proceed with Node 2 installation, windows 2008 failover cluster perfectly does the failover transitions. SQL Node 1 installation successfully installed.
available online resources while proceeding to SQL node 2 (analysis service graph)
MSDTC path.
"
Validating cluster resource SQL Server (GP_PROD).
This resource is configured to run in a separate monitor. By default, resources are configured to run in a shared monitor. This setting can be changed manually to keep it from affecting or being affected by other resources. It can also be set automatically by the failover cluster. If a resource fails it will be restarted in a separate monitor to try to reduce the impact on other resources if it fails again. This value can be changed by opening the resource properties and selecting the 'Advanced Policies' tab. There is a check-box 'run this resource in a separate Resource Monitor'.
"
However the over all result showed, "Testing has completed successfully. The configuration appears to be suitable for clustering. However, you should review the report because it may contain warnings which you should address to attain the highest availability".
This warning message goes off after installing the SQL 2008 R2 on node second.

No comments:

Post a Comment